Friday, 3 February 2017

February saw us starting to lift the floorboards then suspend 100mm insulation on netting between the joists with a membrane on top. Then the floorboards went back down, with some extras to cover breakages.


In the images we've already removed the walls between two the bedrooms shown and the one to the living room. Amazingly we found there were no load-bearing walls. The roof is supported entirely on the outer walls. 